In its quest to play the lead role in helping the Nation meet its demand for power, TRF is speeding up all its projects, including the Rs 413.85 crores project for Damodar Valley Corporation (DVC) at Raghunathpur, West Bengal. Spearheaded by Mr P C Sinha, this 2X600 MW CHP project is expected to be commissioned in 2011.

The scope of work for TRF covers:
•    Equipment Supply: Supply, Design, Engineer, Manufacture, Inspect, Test and Package Plant and Equipment including mandatory spares, tools and tackles.
•    Services: Port clearance, Port handling, Port charges, transportation for delivery at site, installation, insurance covers other than inland transit insurance, civil work and structural work, testing and commissioning ,including carrying out guarantee tests in respect of all other services.

In addition to the site work, TRF is also responsible for supply of major project equipments, items and utilities such as: 

•    One Wagon Tippler with Hydraulic Drive and Side Arm Charger with hydraulic Drive.
•    Two Stacker Cum Reclaimers.
•    Four Plough Feeders with hydraulic drive.
•    One Apron Feeder.
•    Four Roller Screens.
•    Four Ring Granulators.
•    Four Travelling Trippers.
•    26 Belt Conveyors (Approx 6.5 KM)
•    One Dry Fog System, DE System, VE System and Systems for Plain Water Service, Portable Water, Cooling Water and Sampling of Water.

Work on the project has been progressing at great speed. Excavation work at areas where important equipment such as track hopper, wagon tippler, stacker/ reclaimer and crusher house are to be installed, have been completed while others are in progress.

The work completed so far:

Track Hooper Area:
Excavation work has been completed, PCC work has been completed; RCC work for Raft is complete and construction of the second lift wall is in progress.

Wagon Tippler Area:
Excavation has been completed.

Stacker/Reclaimer Area:
Excavation work completed; 75% RCC work for footing completed for one stacker / reclaimer.

Crusher House Area:
Excavation work has been completed and RCC work for foundation is in progress.

Conveyor 3A/3B:
RCC work for trestle footing is in progress.