Setting up a coal handling plant for a-2X250 MW coal fired power plant for NSCPL, a joint venture between NTPC and SAIL. |
| • |
Complete civil work, fabrication and erection of building and technological structural and equipment supply, erection, testing and commissioning. |
| • |
Civil work involves approximate 30,000 cubic meters concrete and building structural approximately 3800 MT. |
| • |
Supply and installation of Rotary Plough Feeder (04), Stacker Re-claimer(01), Wagon Tippler with Side Arm Charger (01), Crusher R-33 (04), truflo feeders, belt feeders (06) and vibro feeders (all 01), Travelling Tippers (02) and a coal sampling system. |
| • |
Being a turn key order, TRF will supply all conveying equipment and undertake all electrical work. |
| • |
Setting up some utility systems for dust suppression, dust extraction, fire fighting and ventilation system. |
| • |
Radial Stacker re-claimer that will be set up by TRF has been supplied by Schade, Germany. This is the biggest ever Radial Stacker re-claimer made by Schade. It is approximately 700 MT machine, with central column as the axis, on which it rotates on a circular rail of 128 metres diameter. |
| • |
Wagon Tippler with hydraulic drive supplied here is the first of it's kind by TRF. |
| • |
Conveyor # 5 gallery is unique as it hangs from both ends from the drive house. |
| • |
In total, there are four transfer points, a drive house, crusher house and a sampling station. |
| • |
There are 16 conveyors. |